Product Detail :
|
Vadodara-geratpur section (up and dn line)-through ballast recoupment 8.095 kms. on dn line and 5.226 kms. on up line at isolated locations, rubber pad renewal 25.617 kms. on dn line & 21.638 kms. on up line at isolated locations, erc & liner renewal 27.020 kms. on dn line & 17.022 kms. on up line at isolated locations, liner renewal 7.280 kms. on dn line & 0.910 kms on up line at isolated locations. (total tbr=13.321 kms, tfr=99.487 kms.) and anand-godhra section-through rail renewal (p) with 60 kg (90 uts) between km. 19.002 to km. 19.226, km. 60.242 to km. 60.502, km. 633.347 to km. 63.578, km. 66.768 to km. 66.988 & km. 77.980 to km. 78.068, through ballast recoupment between km. 38.000 to 38.253 & km. 77.279 to km. 78.720 and renewal of 21 sets 60 kg sejs at isolated locations {trr(p)=1.023 kms, tbr=1.694 kms & tsejs =21 sets.}
|