|
Product Detail :
|
Supply And Installation Of Aerosol Fire Detection And Suppression System Cartridge 100G + 100G Total Two , As Per The Technical Requirement Specified In Annexure G-1 Of Rdso Specification Rdso/Pe/Spec/Ac/0192-2018 (Rev.1) And Revised Activation Temperature Setting Of As 68-72 Degree Celsius As Per Rdso Letter No. El/7.1.108/Sbc/Main Dt 06.08.25. These Cartridges To Be Installed In Sbc Panels Of Lhb Ac Coaches. All Necessary Modification, Back Pieces, Mounting Accessories Etc. Required For Installation Of This Item Shall Be With The Scope Of Supplier. Only Rdso Approved Firepro, Stat-X, Pyrogen, Dspa & Jetik Innovation Make, Aerosol Shall Be Accepted. [ Warranty Period 30 Months After The Date Of Delivery ] ]Supply & Installation Of Aerosol Fire Detection & Suppression System Cartridge In Sgac Coaches, As Per The Technical Requirement Specified In Annexure G-1 Of Rdso Specification Rdso/Pe/Spec/Ac/0192-2018 (Rev.1) And Common List Of Bill Of Material Issued By Rdso Letter El/7.1.108/Mssbc Dated 17.09.2022. Revised Activation Temperature As 68-72 Degree Celsius As Per Rdso Letter No. El/7.1.108/Sbc/Main Dt 06.08.25 Aerosol Cartridge Set For Each Coach Shall Be As Follows- (1)Minimum 40 G- 01 Nos For Power Panel , (2)Minimum 15Gram- 02 Nos For Rmpu Control Panels, (3) Minimum 10 Gram-01 Nos For Inverter Panel (01 Set = Total 4 Nos. Aerosols) . All Necessary Modification, Clamping Arrangement Andaccessories Required For Installation Of This Item Shall Be With The Scope Of The Supplier. Only Rdso Approved Firepro, Stat-X, Pyrogen, Dspa & Jetik Innovation Make, Aerosol Shall Be Accepted. ]
|
| Tender Detail : |
Supply & Installation of Aerosol Fire Detection & Suppression System
cartridge .#* Supply & Installation of Aerosol Fire Detection & Suppression System Cartridge
in Sgac Coaches, as Per the Technical Requirement Specified in Annexure G-1 of Rdso Specification Rdso/
pe/spec/ac/0192-2018 (rev.1) and Common List of Bill of Material Issued By Rdso Letter El/7.1.108/mssbc
dated 17.09.2022. Revised Activation Temperature as 68-72 Degree Celsius as Per Rdso Letter No. El/7.1.1
08/sbc/main Dt 06.08.25 Aerosol Cartridge Set for Each Coach Shall Be as Follows:- (1)minimum 40 G- 01 No
s for Power Panel , (2)minimum 15gram- 02 Nos for Rmpu Control Panels, (3) Minimum 10 Gram-01 Nos For
inverter Panel (01 Set = Total 4 Nos. Aerosols) . All Necessary Modification, Clamping Arrangement And
accessories Required for Installation of This Item Shall Be with the Scope of the Supplier. Only Rdso Approve
d Firepro, Stat-x, Pyrogen, Dspa & Jetik Innovation Make, Aerosol Shall Be Accepted. ] |